After volumetric heat treatment, local heat treatment of the closing assembly column's top welded joint in Kstovo was carried out.
Works were carried out at an altitude of 56 meters above the ground. At the beginning of the work, there were difficult conditions.
But at the end of the work, the weather improved, also like the mood of our staff!
Our specialists have done the job well and on time!