The supply of equipment to the new "Neftemash" plant
The supply of equipment to the new "Neftemash" plant
21.12.2010
The supply of equipment for heat treatment to the new plant of petrochemical engineering was carried out. Two units RT 150-12 were successfully introduced into production.